Installation Timetable

Standard snack and drink vending facilities can be installed within a reasonable time period based on the number and type of machines, but generally within 2-4 weeks.

Installation of the “Micro” Mini Mart facility requires fit out and construction services so installation normally takes 4-8 weeks depending on the location within the building and accessible utilities.